Event Documents
Railway Interest Group

Below you will find all the relevant documents for the chosen event.

Disclaimer

These resources are provided as a courtesy, the contents are the most up-to-date material available at the time of publishing.

The presentations provided for distribution are solely the responsibility of the providers. Neither the INCOSE UK, Dot-The-Eye Ltd, any of the our sponsors, make any warranty as to the accuracy or completeness of the information published, nor its compliance with any laws, regulations or policies that may govern it.

Date/Time Organisation & Location Description
14/06/2011 -
14/06/2011

1700H for 1730H
Railway Interest Group

Arups offices at 8 Fitzroy Street, London,W1T 4BQ in the Emmeson Room
A Systems Solution for Mid Tunnel Vent Shafts (LU Cooling the Tube Programme)

A previous presentation by David Steward discussed organisational options for embedding systems engineering into the team. Since then there have been significant changes to the programme and team structure. This presentation looks at how systems engineering has been embedded and addresses some of the key system issues for the programme. It will also present and example of systems definition of one of the programmes key deliverables, i.e., a Mid Tunnel Vent Shaft Upgrade.

The session covers:

  • How systems engineering was incorporated into the organisation
  • Outline definition of a Mid Tunnel Vent Shaft as a system
  • Revision of the requirements structure
  • Managing interfaces
  • Validation / Assurance

 

Title Author Doc Type Doc Date File Type View
A Systems Solution for Mid Tunnel Vent Shafts (LU Cooling the Tube Programme)  Bruce Elliott  Flyer  15/03/2011  pdf   Open 
A ‘Systems Solution’ for Mid Tunnel Vent Shafts  David Steward  Presentation  06/06/2011  pdf   Open